Last edited by Gajind
Monday, August 10, 2020 | History

1 edition of Addendum to draft environmental impact report for Ferry Building complex found in the catalog.

Addendum to draft environmental impact report for Ferry Building complex

Addendum to draft environmental impact report for Ferry Building complex

  • 350 Want to read
  • 0 Currently reading

Published by The Dept. in San Francisco, Calif .
Written in English

    Subjects:
  • Buildings -- California -- San Francisco -- Repair and reconstruction.,
  • Transportation buildings -- California -- San Francisco.,
  • Waterfronts -- California -- San Francisco -- Planning.

  • Edition Notes

    Other titlesFerry Building complex.
    StatementSan Francisco Department of City Planning.
    ContributionsSan Francisco (Calif.). Dept. of City Planning.
    The Physical Object
    Paginationii, 65 p. :
    Number of Pages65
    ID Numbers
    Open LibraryOL22947711M

    An environmental assessment addendum or environmental impact assessment addendum is an addendum attached to a real estate contract, wherein the parties agree that environmental assessment requirements shall be completed by the buyer prior to execution the contract. They are involved in environmental assessment and preparation of reports on. DRAFT ENVIRONMENTAL IMPACT REPORT FACT SHEET SEPTEM WELCOME. Welcome to the Water Supply Contract Extension Project (proposed project) public meeting for the Draft Environmental Impact Report (DEIR) meeting. Today’s meeting is being held from pm to pm. At pm and again at pm DWR will make a.

    Addendum to Environmental Impact Report Decem 5 CASE NO. E Calaveras Dam Replacement Project The geological and geotechnical study of the left dam abutment excavation also resulted in refinements to the additional temporary and permanent disposal requirements previously described in MPM Nos. 19 and Draft Environmental Impact Statement to Analyze Impacts of Issuance by the National Marine Fisheries Service and the U.S. Fish and Wildlife Service of Two Incidental Take Permits under Section 10 of the Endangered Species Act for Implementation of the Washington Department of Natural Resources’.

    EnviRonMEnTAl iMPACT REPoRT Before or during the initial study process, the Department may determine that the project could have a significant effect on the environment and that an EIR is required. The determination that an EIR is required is published in a local newspaper, posted at the Department, at the subject site, and on the sfplanning.   [FR Doc. – Filed 9–26–19; am] BILLING CODE –JA–P DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD LER LVRWB09B 19X (MO#)] Notice of Availability of the Final Environmental Impact Statement and Environmental Impact Report and Proposed Land Use Plan Amendment to the .


Share this book
You might also like
production-inventory control problem

production-inventory control problem

International strategies for Canadian business

International strategies for Canadian business

Perry J. Knoles.

Perry J. Knoles.

Positive Thinking-1996 Calendar

Positive Thinking-1996 Calendar

Library opportunities for Texans ...

Library opportunities for Texans ...

Mountain of dreams

Mountain of dreams

Chemistry and methods of enzymes

Chemistry and methods of enzymes

Malnutrition and endemic diseases

Malnutrition and endemic diseases

Life and its problems, as viewed by a blind man at the age of ninety-six

Life and its problems, as viewed by a blind man at the age of ninety-six

Practical Non-Destructive Testing

Practical Non-Destructive Testing

Photographs of Bomarzo

Photographs of Bomarzo

The American combat aircraft and helicopters of the Vietnam war

The American combat aircraft and helicopters of the Vietnam war

Distribution of high grade sandstone for aggregate usage in parts of south west England and South Wales

Distribution of high grade sandstone for aggregate usage in parts of south west England and South Wales

Basic methods for experiments on eggs of marine animals

Basic methods for experiments on eggs of marine animals

Addendum to draft environmental impact report for Ferry Building complex Download PDF EPUB FB2

Long Range Development Plan EIR 3 Addendum to Final Environmental Impact Report (3) Davies Campus included construction of a new, four-floor, foot-tall, 50,gsf Neuroscience Institute building on a portion of the campus at the corner of Noe Street and Duboce Avenue.

an Addendum to the Final Environmental Impact Report (EIR) for Plan Bay Area pursuant to CEQA guidelines Section The Final EIR for Plan Bay Area (State Clearinghouse No.

) was certified by MTC and ABAG on J On JMTC and ABAG released the Draft Addendum to Plan Bay Area Final EIR for. EIR Addendum 1 INTRODUCTION 2 3 In Aprilthe California State Lands Commission (Commission or CSLC), as lead 4 agency under the California Environmental Quality Act (CEQA), certified a Final 5 Environmental Impact Report (EIR) for.

subsequent or supplemental environmental impact report is required. In accordance with CEQA Guidelines Sectionthis addendum to the FEIR analyzes bus stop, intersection, parking, and pedestrian changes to the Geary BRT project (project changes) that have.

Draft Addendum to the Final Environmental Impact Report Plan Bay Area (State Clearinghouse No. ) Draft Issued: J June Addendum 5 to the Environmental Impact Report (06/05/19) Addendum 4 to the Environmental Impact Report (06/15/16) Addendum 3 to the Environmental Impact Report (01/14/16) Notice of Hearing on Draft Environmental Impact Report Newspaper Ad (06/24/) Environmental Impact Reports and Negative Declarations.

This document constitutes Addendum #1 to the Final Environmental Impact Report (EIR) for the California State University, Long Beach (CSULB) Campus Master Plan Upda te (State Clearinghouse #), certified by the California State University (CSU) Board of Trustees (BOT) in May The Campus Master Plan addresses.

Addendum to Environmental Impact Report Case No. E J Calaveras Dam Replacement Project 8 due to construction-related sediment discharges and her increased turbidity or ot contamination, including resident rainbow trout and other native and non-native species in the reservoir.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, Augat AM in the Manhattan Municipal Building, Mezzanine level, 1 Centre Street, New York, New York (access through the North Entrance), in conjunction with CPC’s citywide public hearing pursuant to ULURP.

DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT Purpose of this report: This Draft Environmental Impact Assessment Report forms part of a series of reports and information sources that are being provided during the Environmental Impact Assessment (EIA) process for the proposed Atlantis Gas-to-Power Project, Western Cape.

Addendum to Environmental Impact Report Courtyard 2 Projects July Project Characteristics. Since certification of the FEIR, the Airport has completed many of the projects under the Master Plan Program. However, a number of projects were delayed because of adverse economic conditions and.

building commissioning management goals and requirements and also amended portions of EPAct and NECPA. EISA was signed into law in December • Executive OrderFederal Leadership in Environmental, Energy and Economic Performance (signed in October of ) directs Federal agencies to further address energy, water, and.

Transportation (“Caltrans”) District 4, released their Draft Environmental Impact Report/Environmental Assessment for the U.S. Highway Managed Lanes Project in San Mateo County. The project was included in the Plan’s financially constrained transportation investment. Full text of "Draft environmental impact report for the I transfer concept program in San Francisco, California" See other formats.

Final Environmental Impact Statement Addendum The Waterfront District Sub-Area Plan Project Final EIS Addendum Impact Statement. Final Environmental Impact Statement. Final Environmental Impact Statement Addendum.

Supplemental Draft EIS. Lease Opportunities (PDF) Tenant Directory. Pay Your Bill. Broker Compensation (PDF) Port Home. Program Environmental Impact Report (EIR) No. / SCH No. Based on all available information in light of the entire record, the analysis in this Addendum, and pursuant to Section of the State CEQA Guidelines, the City has determined the following.

Environmental Impact Report (EIR). CEQA does not require that an Addendum be circulated for public review. Previous Environmental Studies The San Francisquito Creek Flood Reduction, Ecosystem Restoration, and Recreation Project was evaluated in an Environmental Impact Report prepared pursuant to the requirements of CEQA.

The. An addendum is an appropriate environmental document for considering these relatively minor changes to the specificplan since none of the changes proposed will cause new significant environmental effects or substantial increases in previously identified significant environmental effects.

(CEQA Guidelines, §§subd. (a)(l),subd. ADDENDUM TO A PROGRAM ENVIRONMENTAL IMPACT REPORT Project Number: Addendum to PEIR No. / SCH No. Page 2 TablePlanned Land Use Distribution, to remove the breakout between residential and mixed use. Addendum to Environmental Impact Report Case No.

E Calaveras Dam Replacement Project With the DSOD-restricted maximum elevation of feet (approximat AF) and a previous California Department of Fish and Wildlife (CDFW) established minimum lake level elevation of. This banner text can have markup. web; books; video; audio; software; images; Toggle navigation.ENVIRONMENTAL IMPACT REPORT ADDENDUM 23 DECEMBER, SOUTH EXTERIOR ELEVATION 16 1ST STORY F.F.E.

' - 3" 2ND STORY F.F.E. ' - 6 1/2" 3RD STORY F.F.E. ENVIRONMENTAL IMPACT REPORT ADDENDUM 23 DECEMBER, BUILDING CROSS SECTION 16 Title: P:JobsX9_Jacobs Hallcomputer modelReferenceX9_Jacobs .This draft environmental impact statement to license the Eagle Mountain Pumped Storage Project is being made available for public comment on or about Decemas required by the National Environmental Policy Act of 1 1.

National Environmental Policy Act ofamended (Pub. L. 42 U.S.C.